Details: removal of land slide/slips clearance.removal of landslides in hilly areas ordinary rocks not requiring any blasting by mechanical means including cutting and trimming of slopes material with in a lift up to 1.5 meter and lead up to 1 km as per technical specification 302.3.5 and 1611 complete as per hppwd specifications and disposal of all muck at dumping site to be arranged by contractor as his own level with all kind of transportation/mechanical charges including all kind of txes etc.
Sector: Agri Marketing