Details: preparation of surfaces by brushing with wire brushes for removing caked mud etc. sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc. water bound macadam surface (new) preparing surfaces by brushing with wire brushes for removing caked mud etc. sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc. black top surfaces providing and applycing tack coat with bitumen vg10 using distributor at the rate of 1 kg per sqm providing and applycing tack coat with bitumen vg10 using distributor at the rate of 0.50 kg per sqm providing and laying bituminous concrete 30 mm thick (thirty millimetre) with tph batch type hot mix plant producing an average output of 75 tonnes per hour suing crushed aggregates of specified grading, premixed with bituminous binder vg-10 @ 5.4 to 5.6 per cent of mix and filler having anti stripping agent such as "eva thermo" or equivalent mixed in bitumen@0.40% of
Sector: Municipality