Details: demolishing of cement concrete manually/ by mechanical means including disposal of material within all leads and lifts complete in all respect and to the entire satisfaction of the engineer-in-charge. cutting in earth work and disposal of excavated earth upto a lead of 20 mtrs. chiselling work in soft rock complete in all leads and lifts complete in all respect and to the entire satisfaction of the enginneer-in-charge. earth work in excavation by mechanical means (hydraulic excavator) / manual means in foundation, trenches or drains, pits upto all depths in all classification of earth work such as pick work, jumper work, saturated soil including bailing and pumping out water, chieselling soft / hard rock including getting out the excavated soil, dressing of sides, ramming of bottoms and returning the soil as required in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and then disposing of surplus excavated soil as directed,
Sector: Agri Marketing