Details: civil component earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30cm in depth,1.5 m in width as well as 10 sqm on plan) including getting out and disposed of excavated earth, lead upto 50m and lift upto 1.5m, as directed by the engineer-in-charge. filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth consolidating each deposited layer by ramming and watering, lead upto 50m and lift upto 1.5 m supplying and filling in plinth with sandy soil under floors including watering, ramming, consolidating and dressing complete. providing and laying cement concrete of specified grade excluding the cost of centering and footing shuttering- all work upto plinth level:(a)1:5:10 (1 cement : 5 c/sand: 10 graded stone aggregate 40mm nominal size. 1:5:10 (1 cement : 5 c/sand: 10 graded stone aggregate 40mm nominal size. providing and laying in position specific
Sector: Social Development