Details: earthwork in excavation by manual means upto a depth of 2m below the existing ground level for foundation trenches of foundations, footings of column/ walls, retaining walls, septic tank etc. including bailing out water where necessary and removal of surplus earth with all lead and lifts as directed and specified for the following classification of soils.(a) all kind of soil (ordinary soil/ hard soil/ dense soil) providing soling with stone/ best quality picked jhama brick, sand packed and laid to level and in panel after preparing the subgrade as directed including all labour and materials and if necessary dewatering, complete.(b) stone soling(i) 100mm plain cement concrete works in foundation bed for footing steps, walls, brick works etc below plinth level as directed and specified including dewatering if necessary, and curing complete (shuttering where necessary hall be measured and paid seperately).(b) 1:3:6(1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size) ran
Sector: Renewable Energy