Description: Reconstruction of damaged south side compound wall and water proofing treatment to the roof at District Police Head Quarters Karaikal Name of Work Reconstruction of damaged south side compound wall and water proofing treatment to the roof at District Police Head Quarters Karaikal
Details: Earthwork in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed , within a lead of 50m - all kinds of soil Supplying chemical emulsion in sealed containers including delivery as specified - Chloropyriphos / lindane emulsifiable concentrate of 20% Diluting and injecting chemical emulsion for POST - CONSTRUCTIONAL anti-termite treatment (excluding the cost of chemical emulsion) - along external wall where the apron is not provided using chemical emulsion @ 7.5 litres / sqm of the vertical surface of the substructure to a depth of 300mm including excavation channel along the wall and rodding etc.complete - with chloropyriphos / lindane E.C. 20% with 1% concentration Providing and laying in position cement concrete of specified gra
Sector: PWD