Details: demolishing r.c.c. work manually/ by mechanical means includingstacking of steel bars and disposal of unserviceable material within50 metres lead as per direction of engineer - in- charge. earth work in excavation in foundation lift upto 1.50 m and lead upto 50 meters including filling, watering & remaining of excavated earth in to the trenches or in to the space between the building and side of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by engineer - in - charge. filling of earth and stone filling in plinth including watering, dressing ,ramming etc. concrete with cement, coarse sand cu.m and 40 mm gauge stone ballast in proportion 1:4:8 in foundations and floors including supply of all material,labour and t&p etc. required for proper completion of the work. p/l in position rcc 1:1.5:3 (1 cement : 1.5 c/sand : 3 stone agg. 20 mm size) ex. the cost of c/shuttering, finishing and reinf. - all work upto plinth level (in foundation).