Description: Boundry Wall Earth Filling and Tiles Road Construction Name of Work 09
Details: आवास विकास वार्ड नं. 09 में पार्क की चाहरदीवारी, मिट्टी भरान व टाइल्स सड़क का निर्माण कार्य. GST 18% Extra. Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Concrete with cement, coarse sand and 40 mm gauge stone ballast in proportion 1:4:8 in foundations and floors including supply of all material, labour and T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203 2-2 Brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203 Brick masonry in 1:4 cement morta 11-5-2 Providing concrete for plain/ reinforced concret
Sector: Municipality