Description: Construction of Civil Work in ABC Centre at Sarai Haridwar Name of Work Construction of civil work in ABC centre at Sarai Hardwar
Details: Construction of civil work in ABC centre at Sarai Hardwar Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. 4-11-1 Using naturally occuring gravel Concrete with cement, coarse sand and 40 mm gauge stone ballast in proportion 1:4:8 in foundations and floors including supply of all material, labour and T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203. Providing and Laying of Interlocking Concrete Block (M-35) Pavements having thickness 80 mm as per drawings and Technical Specification Clause 1504. Plain/Reinforced cement concrete in open
Sector: Municipality