Details: earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sq m on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by engineer-in-charge. - all kinds of soil providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level : - 1:4:8 (1 cement : 4 coarse sand (zone-iii) : 8 graded stone aggregate 40 mmnominal size) providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level : - 1:2:4 (1 cement : 2 coarse sand (zone-iii) : 4 graded stone aggregate 20 mm nominal size) random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level wit
Sector: Agri Marketing