Details: bill of quantity excavation in all types of soil including morrum, hard soil, gravelly soil or slushy soil for foundation of wall, columns, plinth beams, basement, rail ducts, trenches, under ground sumps, septic tanks etc. including shoring, strutting, bailing out water/pumping out water if required, refilling the trenches / foundation pits in layers of 150mm to 200mm, ramming, watering consolidating removing and stack-ing simultaneously the surplus excavated stuff as directed within the site area upto a lead of 100m and or spreading the same in layers for site development and consoli-dating as directed, including cost of labour tools and plants, taxes etc. complete as per direction of engineer-in-charge.a) from exiting ground level upto 1.5 m depth.as per direction of engineer-in-charge. filling in plinth with selected excavated earth available within site (lead not exceeding 100m) in layers of 15cm to 20cm including watering, consolidating, ramming and compacting etc. complete as d
Sector: Dairy