Details: site clearance for cutting bushes cleaning the sites etc complete. earth work excavation in stony earth and gravel mixed with stone and boulder not exceeding on 0.014 in volume within 50m initial lead and 1.5m initial lift including rough dressing and breaking clods and max. 5 cm to 7 cm and lying in layer not exceed 0.3 mtr in depth as per specification approved by the department. cutting the disintegrated rocks not requiring blasting to be removed by pick axes and craw bars and depositing materials within 50m and 1.5m initial lift including rough dressing as per direction of eic. 2nd depth- cutting the disintegrated rocks not requiring blasting to be removed by pick axes and craw bars and depositing materials within 50m and 1.5m initial lift including rough dressing as per direction of eic. 3rd depth- filling the f & p with sand well watered and rammed etc complete supplying & fitting & fixing of 110 mm (od) pvc pipes (4 kg/cm2) of including all cost for socket, bend, solvent
Sector: Ground Water Dept