Details: site clearance for cutting bushes cleaning and levelling of the surface of sites etc complete. earth work excavation in hard soil, embankment of tank in hard soil or gravelly soil within 50m initial lead and 1.5m initial lift including rough dressing and breaking clods and max.. 5 cm to 7 cm and lying in layer not exceed 0.3 mtr in depth as per direction of the engineer-in-charge. ls cutting the disintegrated rocks not requiring blasting to be removed by pick axes and craw bars and depositing materials within 50m and 1.5m initial lift including rough dressing as per direction of eic. 2nd depth cutting the disintegrated rocks not requiring blasting to be removed by pick axes and craw bars and depositing materials within 50m and 1.5m initial lift including rough dressing as per direction of eic. 3rd depth filling the f & p with sand well watered and rammed etc complete cement concrete (1:3:6) with 40 mm. size h.g. metal - including cost,carriage,royalty of all materi
Sector: Ground Water Dept