Details: earth work in ordinary soil within 50m. initial lead and 1.5m. initial lift including rough dressing and breaking clods to maximum 5cm.to 7cm. and laying in layers not exceeding 0.3 m. in depth asper direction of the engineer-in-charge. filling foundation and plinth with sand and wel watered &rammedetc . complete including cost of sand . providing, conveying and laying moorum in sub-base in layers not exceeding 100 mm. watering and compaction to the required density in omc with prr including hire and running charges of prr and cost, conveyance of all materials etc. complete as per direction of engineer-in-charge. cement concrete (1:4:8) by using 4cm. size b.h.g. metal including cost, conveyance etc. complete. etc. complete. rcc work of m 20 grade with 20 mm and down grade black hard granite (hand broken) stone chips including hoisting and laying. supplying, fitting and placing uncoated hysd bar reinforcement complete as per drawing and technical specification. rigid and smooth center
Sector: Municipality