Details: earthwork excavation in hard soil within 50mtr initial lead, 1.5m initial lift including rough dressing and breaking clods to maximum 5 cm to 7 cm and laying in layers not exceeding 0.3 m in depth and as per direction of the engineer-in-charge. fiilling in foundation & plinth with sand, incl. watering & ramming as per direction of engr.-in-charge. c.c.(1:3:6) with 40mm hbhg metal including cost,carriage and royalty of materials . rcc work of m-20 grade with 20mm and down graded cbhg chips incl. hoisting and laying incl cost, conveyance & royalty of materials (unit-1 ) supplying, fitting & placing uncoated hysd bar reinforcement complete as per drawing and techinical specification with cost, conveyance of rod & binding, wire etc complete. (data for 1 mt.) rigid & smooth centering & shuttering for c.c wall including false works and dismantling them after casting including cost of materials complete. sign board & photograph
Sector: Municipality