Details: laying and jointing pvc pipe. heading earth work excavation of foundation in hard soil or gravelly soil within 50m. initial lead and 1.5m. initial lift icluding rough dressing and bracking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m. in depth and as per the direction of the engineer-in-charge. providing and laying sub-base in layers not exceeding 100mm watering and compaction to the required density in o.m.c. with prr including cost and conveyance, royality and taxes of sub-base materials etc. complete as per direction of the engineer-in-charge. cement concrete (1:3:6) with 40 mm size cb broken hard granite metal including all cost of materials, labour, conveyance, royalty, cess, tools and plants water for curing etc. all complete, as per opwd specification required for the work to finished items of work. cement concrete (1:2:4) with 12mm size crusher broken hard granite chips including hosting and laying all cost of materials, labour, conveya
Sector: Municipality