Details: earth excavation of foundation in hard soil within initial lead & lift including leveling the bed & depositing the soil away working area etc completed as direction of engineer. filling in foundation and plinth with sand including quarring, collecting, conveying, supplying and watering incuding cost, conveyance,roylaty & taxes of all materials. & cost of all labour, t & p etc. complete. s/r p c.c. (1:4:8) using 4cm. size b.h.g. (c.b.) metal including cost, conveyance & royalty of all materials, cost of all labour , labour cess, t & p, watering, curing etc. complete. cement concrete (1:2:4) using 12mm. size c.b.b.h.g chips including cost of all materials etc. complete. r.c.c. m20 grade using 20mm and down graded size chips including cost conveyance etc. complete supplying all material labour t&p and providing ms reinforcement of rcc work including cutting bending and laying the grill and position including cost of binding wire 18 to 20 guage. rigid & smooth center
Sector: Municipality