Details: dismantaling and removing cement concrete including stacking the materials for reuse and removing the debries within 50 m. lead. earth work in ordinary soil within 50m. initial lead and 1.5m. initial lift including rough dressing and breaking clods to maximum 5cm.to 7cm. and laying in layers not exceeding 0.3 m. in depth asper direction of the engineer-in-charge. filling foundation and plinth with sand and wel watered &rammedetc . complete including cost of sand . cement concrete (1:4:8) by using 4cm. size b.h.g. metal including cost, conveyance etc. complete. rcc work of m 20 grade with 20 mm and down grade black hard granite (crusher broken) stone chips including hoisting and laying. supplying, fitting and placing uncoated hysd bar reinforcement complete as per drawing and technical specification. rigid and smooth centering and shuttering for r.c.c. works including false works and dismentalingthen after casting including cost of materials complete. c) r.c.c. foundation and plinth b
Sector: Municipality