Details: earthwork excavation in hard soil in foundation & plinth within 50.0m intial lead and 1.5m intial lift including rough dressing and breaking clods etc all cost complete. supplying and filling of sand to the foundation bed of columns pit, wall foundation and inside the filling with well watered and rammed etc and complete as per the direction of e.i.c. pcc (1:3:6) with 40mm crusher broken hard granite metal including cost, conveyance, royality, taxes, labour, t&p etc all complete. rcc m20 concrete using 20mm & down graded crusher broken black hard granite chips including cost, conveyance and royality of all materials, cost of all labour, t&p etc. complete. supplying, cutting, fitting of sail/jindal ismb 150i-section having dimension 150mmx75mmx5mm stractural beam and column fabricated/bolted in proper position complete including standing in proper position with yellow and black colour on surface over one coat primer and as per drawing and technical specification. cost of letter on bar
Sector: Municipality