Details: earthwork in excavatiuon for foundation trenches of walls, retaining walls, footings of column, steps, septic tank etc. including refilling (return filling )the quantity as necessary after completion of work, breaking clods in return filling, dressing, watering and ramming etc. and revomal of surplus earth with all lead and lifts as directed and specified in the following classification of soils including bailing out water where necessary as directed and specified. (a) upto a depth of 2.00 m below the existing g.l. in hard/dense soil. demolishing cc floors of various thickness including top layer and base course and disposal of debris as directed for all levels. providing brick soling in foundation and under floor with stone/ best quality picked jhama brick, sand packed and laid to level and in panel after preparing the subgrade as directed including all labour and materials and if necessary dewatering, complete. brick on flat soling. plain cement contrete works with coarse aggregate o
Sector: Mining