The South Eastern Coalfields Limited has published a tender for "Providing Protection wall at the upstream and downstream end of Hume pipe installed beneath the OB ramp road for proper drainage of mine water at Dharam patch of Chhal OCP mine of Chhal sub-Area (2nd Call)" on the 16 Mar 2026. This tender belongs to Colliery Improvement Services category. This tender is published in Raigarh, Chhattisgarh location. The vendors interested in this tender and related Colliery Improvement Services tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: all civil works Tenders | blasting services Tenders | chute installation Tenders
Related categories: Colliery Improvement Services Tenders | Colliery Tenders |
In Raigarh district, Chhattisgarh, a total of 3 Colliery Improvement Services tenders have been published, with 1 tenders released last quarter.
| Tender Title | Providing Protection wall at the upstream and downstream end of Hume pipe installed beneath the OB ramp road for proper drainage of mine water at Dharam patch of Chhal OCP mine of Chhal sub-Area (2nd Call) |
|---|---|
| Tender Description | item description,part-a protection wall with drain,for two number cross drainage of hume pipe. earth work in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.all kinds of soil. earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by engineer-in-charge.all kinds of soil filling available excavated earth (excluding rock) in trenches, plinth. sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m a |
| Comments | item description,part-a protection wall with drain,for two number cross drainage of hume pipe. earth work in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.all kinds of soil. earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by engineer-in-charge.all kinds of soil filling available excavated earth (excluding rock) in trenches, plinth. sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m a |
| Published Date | |
|---|---|
| Due Date | 01 Apr 2026 00:00:00 |
| Estimated Value | 1.42 Crore |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |