Description: Reconstruction Work of Patkum MDR 156 Ichagarh Patpur Nahar Dulmidih to Laba Road Total Length 16 76 Km for the year 2023 24 Name of Work Re construction Work of Patkum MDR 156 Ichagarh Patpur Nahar Dulmidih to Laba Road Total Length 16 76 Km for the year 2023 24
Details: Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and tress girth upto 300 mm, removal of stumps of tree cut earlier and disposal of unserviceable materials and stacking of sericeable material to be used of auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm in thickness. (JHRCD SOR 2.03 i A) Cutting of trees stacking of serviceble material with all lifts and up to a lead of 1000 metres. Girth from 300mm to 600mm Removal of stumps, roots, staking of serviceable material with all lifts up to a lead of 1000 metres and earth filling in the depression/ pit. Girth from 300mm to 600mm(JHRCD SOR 2.01 A (i) + 2.01 B (i) ) Cutting of trees stacking of serviceble material with all lifts and up to a lead of 1000 metres. Girth from 600mm to 900mm Removal of stumps, roots, staking of serviceable material with all lifts up to a lead of 1000 metres and earth filling in the depression/ pit.
Sector: Road development