Description: Construction of pasteurization unit for preparation of pasteurized compost through short method of composting including pasteurization tunnel and bunkers for Division of Plant Pathology at Chatha Name of Work Construction of pasteurization unit for preparation of pasteurized compost through short method of composting including pasteurization tunnel bunkers for Division of Plant Pathology under Establishment of pasteurization plant for mushroom cultivation at Main Campus Chatha Group No 2
Details: Earthwork in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains ( not exceeding 1.5 m in width or 10 Sq. m on plan), including dressing of sides & remaining of bottoms , lift upto 1.5 m , including getting out the excavated soil and disposal of surplus excavated soil as directed , within a lead of 50 m All kinds of soil. Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) 1:2:4(1 cement : 2 coarse sand : 4 graded stone aggregate 20
Sector: Agriculture Misc