Description: CONSTRUCTION OF 03 NOS FILTRATION GALLERY NEW TYPE 01 NO 3000 GLNS 01 NO 10000 GLNS 01 NO 20000 GLNS SUMP TANK AS PER WORK NO 4 Name of work CONSTRUCTION OF 03 NOS FILTRATION GALLERY NEW TYPE 01 NO 3000 GLNS 01 NO 10000 GLNS 01 NO 20000 GLNS SUMP TANK AT UNDER WSS GANDHTOP JJM
Details: Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5m, as directed by Engineer-in-Charge. All kinds of soil. Earth work in excavation by manual means in trenches for foundation , drains , pipes cables etc (not exceeding 1.5 mtr in width) and for shafts wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed in all kinds of soils. Supply of stone in Horizontal on level Dumping and filling of stone in Horizontal on level Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work up to plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone upto 40mm thick size nominal size) Providing &la
Sector: Water supply and Sewerage