Description: Construction of Synthetic Badminton Court with sitting tiers at Govt HSS Canal Road Jammu 2nd Time Name of Work Construction of Synthetic Badminton Court with sitting tier at Govt HSS Canal Road Jammu
Details: Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed All kinds of soil Treatment of soil under existing floors using chemical emulsion (Chlorophriphos/Lindane E.C. 20% with 1% concentration) @ one litre per hole, 300mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1:2 (1 cement :2 coarse sand) to match the existing floor Consolidation of subgrade with power road roller of 8 to 12 tonne capacity including making good the undulations etc. with earth or quarry spoils etc. and rerolling the subgrade. Providing, Laying, spreading and compacting stone aggregate of specified sizes 63mm-45mm WBM II specifications in uniform thickness, hand picking, rolling wi
Sector: Sports