Details: structural steel work in built up sections, trusses and framed work,including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. welded ssr 10.2 providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. all work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) ssr 4.4.3 4.6 centering and shuttering including strutting, propping etc. and removal of form work for: 4.6.1 foundations, footings, bases for columns finishing with epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer’s specifications including appropriate priming coat, preparation of surface, etc complete.on steel work ssr 13.60.1 10.25 steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural stee
Sector: Power Sector