Description: same as per enit Name of Work Restoration of Road from fall No 2 upto outfall of Spill Channel CHEP III including drainage works
Details: Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of , lead upto 50 m and lift upto 1.5 m in -All kinds of soil. Laying, spreading and compacting stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road / vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening /binding material to fill up interstices of coarse aggregate, watering and compacting to the required density.g 12.5 mm nominal size) and curing complete Supplying and stacking at site:Graded crushed stone aggregate of size: 53 mm to 22.4 mm Supplying and stacking at site:Graded crushed stone aggregate of size: 13.2 mm nominal size (Type A) Supply and stacking at site stone dust
Sector: Power Sector