Details: supply,carraige upto site, installation, testing and commissioning of 11/0.433kv, 63 kva 3-phase distribution transformers with bimetallic terminal connectors energy level-1 of bis and with lv cable box having detachable aluminium gland plate. transformer should have arrangement for vertical take off supply , transportation and errection of 9mtr long st poles (410 sp-33) completely errected in the pit of 1/5th of the pole length including excavation and back filling of the pole pit. (as per rec standard) supply, transportation and errection of 8mtr long st poles (410-sp 15) completely erected in the pit of 1/5th of the pole length including excavation and back filling of the pole pit . (as per rec standard) supply,carraige upto site,, laying ,stringing, tensioning , binding of acsr conductor, (30mm2 acsr conductor) as per rec standard. supply,carraige upto site,, laying ,stringing, tensioning , binding of acsr conductor, (50mm2 acsr conductor) as per rec standard. supply, transpor
Sector: Power Sector