Details: [11.73.1]finishing with epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer`s specifications including appropriate priming coat, preparation of surface, etc. complete. 1. on steel work [22.103.3]providing and fixing ball valve (brass) of approved quality, high or low pressure, with plastic floats complete : 3. 25 mm nominal bore [22.181]providing and placing on terrace (at all floor levels) polyethylene water storage tank, is : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank. [23.5.6.1]copper wiring in existing pvc/ms conduit pipe surface/recessed for electrical points 6.1. wiring main and sub mains in two single core for phase and neutral wire and one single core for earth wire pvc insulated copper conductor cable 1100 volts grade in existing ms/pvc conduit etc as required. 1 run of size 1.50 sqmm(1/1.40mm) [23.5.6.3]copper
Sector: Urban Authority