Description: Re Construction of V R B at Km 0 000 on Kajari Mr Name of Work Re Construction of V R B at Km 0 000 on Kajari Mr
Details: Earth work in excavation of foundation in ordanary soil including all leads and lifts, labour charges, T& P etc. and disposal of earth as per direction of Engineer-in-charge. Cement Concrete (1:3:6) with cement, coarse sand and 20 to 40mm size stone ballast in foundation of VRB by mechanical mixing I-class brick work in 1:4 cement mortar up to 3.0 mt lift and 60.0 mt leaad of mix material C.C. (1:2:4) cement, coarse sand and 12-20 mm size stone shingle in parapet wall top in coping including all cost of material, labour, T&P required for proper complition of work by manual mixing. Centering & Shuttering for R.C.C. work including cost of centring and shuttering up to 3.0mt height Supply of HYSD steel barincluding bending, binding cutting and placing in position including cost of winding wire in R.C.C. Slab R.C.C 1:1.5:3 in Slab, wearing coat and coping with coarse sand, crushed agg. 12 to 20 mm size & cement including cost of all material labour taxes &carriage upto site of work
Sector: Irrigation