Details: carriage of following material from store center pvvnl to site & vice-versa of work including loading & unloading at both ends maximum distance up to 100 km. as per direction of supervising engineer. pcc/stp pole 8.5/11/13 mtr long. 10 to 400 kva t/f. line material such as ht/lt cross arms, ht/lt pin insulator, ht/lt pin, ht/lt disc insulator with fitting, stay rod, stay wire, lt ab cable (3x120) sq.mm/(3x95) sq.mm, acsr conductor, gi wire, ms angle, iron and ms channel, tpmo, fuse set, earthing, j hook, gi wire for guarding, ms nuts & bolts, suspension clamp etc. distribution box single phase/three phase. of pcc/stp pole 8.5/11/13 mtr long after digging a pit of size 1.6 mtr deep in all type of soil including grouting ratio (1:4:8) & back filling of the pole with proper ramming after completion of work. (as per uppcl respo). fabrication and fixing of all ht/lt line accessories (as per uppcl respo). mounting of 10 to 400 kva t/f (as per uppcl respo). of double pole on pcc/stp pol
Sector: Distribution