Details: dismantling rcc reinforced or brick work including stacking of dismental material etc all comp e/w cutting or ion embankment in ordinary soil exavation to be done pits not exciding 1.5m including all completion of work earth work in excavation in trenches for foundations pipes cables etc in ordinary soil (loan clay or sand) including lift up to 1.5 mtr lead up to 50 mtr and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the engineer-in charge with in a distance of 50 mtr. providing and laying cement concrete (1:6:12, 1cement: 6 fine sand: 12 brick ballast nominal size 40 mm ) and curing complete, including cost of formwork in foundation and floors. class - 150 brick work in (1:4 ) cement mortar in foundation&plinth including supply of all materials labour and tool & plants etc,required for proper completion of the work. 12 mm thick cement plaster 1;4in single coat on both side of single or half brick wall for interior plastering up t
Sector: Municipality