Details: supplying of local earth filling by mechanical transport upto a lead of 5km also includingramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides offoundation etc. complete of all lift . earth work in excavation by mechanical means (hydraulic excavator) / manual means infoundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), includingdressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavatedsoil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1:2:4 (1 cement : 2 coarse sand (zone-lll) derived from natural sources : 4 graded stoneaggregate 20 mm nominal size derived from natural sources). cpwd dehli schedule of rates2023 chapter no. 4 item no.- 4.1.30. brick masonary in 1:4 cement and fine sand mortar and plinth as per drawing ans as per direction in charge all complete plaster 12mm thick with cement, fine sand motar in proportion of 1:4. cpwd dehli scheduleof rate
Sector: Export promotion