Details: providing laying spreading and compactiog graded stone aggregate to wet mix macadam including premixing the material with water at omc in mechanical mix plant,carriage to mixed material by tipper to site, laying in uniform compacted layers of 100 mm thick with paver in sub base/base course on well prepared surface and compactong with vibratory roller to achiver the desired density including all t&p taxes & labour cess etc as directed by engineer in charges etc all. complete (ref.to mort&h specification no 401) providing & laying primer coat with bitumen emulsion (ss) on prepared sureface of granualar base including cleaning of road surfase and spraying primer at th rate of 0.60 kg/sqm using mechenical means. (ref.to mort&h specification no 502) providing & laying tack coat with bitumen vg-10 using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom (ref to mort&h specification no 503) providing and laying de
Sector: Municipality