Details: clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 mabove ground level and removal of up to a distance of 50 m outside the periphery of the area cleared. de- watering by diesel pumping set of hp capacity including hite charge of pumping set and its pol. labour all t&p etc complete in all respect earth work exacavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.50 m and land up to 30 m. including filling, watering and ramming excavated earth into the treanches or into the space betweenthe building and the sides of foundation trenches or into the plinth and removal and disposal of surplus eartt as directed by the engineer-in-charge upto a distance of 30m. from the foundation trenches. cartage or earth required for filling 8.0 km….sheet enclosed…. (a) earth work in cutting or in embankment in ordinary soil excavation to be in the form of regular pits not exceeding
Sector: Municipality