Details: dismentling/chipping cement concrete or brickes or granolythic floors dismentling/chipping cement concrete of water container. repair work in vertical pipes, duck foot bends & related work repairing/ replaceing (if necessary as/ site condition) and refixing of existing vertical pipes/ sluice valve, including fixing of clamps (50 x 5 mm) with pipes and columns at a distance of 1.5 m c/c bt minimum 2 nos. between tow braces with duck foot bends at bottom. duck foot bends will rest on concrete (m 20) pedesttals. top of pedestals/bottom of duck foot bends shall be at floor level of oht pipes shall be enchored (if found necessary with saddle) & grouted with bottom dome. minor repair work in rising main within campus also repairing of existing chamber and block if necessary including supply of all material construction of rcc chamber slab 1:1:5:3 of 100 mm thick within chanal frame construction of floor with apron (1.0 m beyond the outer edge of columns) and cc drain (on outer edge) and t
Sector: RDPR