Details: earth work in cutting or in embankment in oridinary soil, excavation to be in the form of regular pits not exceeding 0.5 m in depth and earth work in embankment to be in 20 cm layers, including ramming and dressing the surface to required levels and slopes and also including 1.50 m lifts and 30 m lead, including its loading, unloading, carriage and all labour and t&p etc. required for proper completion of work. the earth from cutting to be used in making embankment or to be deposited as spoil banks within 30 m distance as directed by e-in-charge. providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per technical specification clause 405. pr
Sector: Agri Marketing