The Rajasthan State Road Development and Construction Corporation GM has published a tender for "STP of 300 KLD Sewage Treatment Plant and 30 KLD Effluent Treatment Plant (including 5 years DLP and O and M) at District Hospital, Bundi (Rajasthan)" on the 26 Feb 2026. This tender belongs to STP O and M category. This tender is published in Jaipur, Rajasthan location. The vendors interested in this tender and related STP O and M tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: all civil works Tenders | panda water tech Tenders | excel filtration treatment plant Tenders
Related categories: Waste Disposal Plant Tenders | FGD System Tenders | Chemical Plant Repair Tenders |
Rajasthan has published 73 tenders in STP O and M in the last financial year.
Out of these, 1 were published last month.
| Tender Title | STP of 300 KLD Sewage Treatment Plant and 30 KLD Effluent Treatment Plant (including 5 years DLP and O and M) at District Hospital, Bundi (Rajasthan) |
|---|---|
| Tender Description | part a sewage treatment plant stp work 300 kld (sewage treatment plant) sub head: sewage treatment plant supply, fabrication, installation, testing and commisioning of fully automatic sewage treatment plant based on mbr process with sewage handling capacity of 300 kld per day. the entire plant will be constructed in msep / jink aluminium febricated. the stp shall be designed as per raw water, with necessary chemical dosing as required by the manufacturer's design. all the equipment, piping, pumps, air blowers and electrical panel etc. (defect liability period will be 05 years, all parts and machinery maintenance, replacement included in 05 year dlp) domestic sewage from domestic ward and hospital toilets, kitchens etc. from the commercial complex and shall be discharged into the stp. design to take consideration of same. daily average flow : 300 m3/day ph : 6.5 - 8.5 bod5 |
| Comments | part a sewage treatment plant stp work 300 kld (sewage treatment plant) sub head: sewage treatment plant supply, fabrication, installation, testing and commisioning of fully automatic sewage treatment plant based on mbr process with sewage handling capacity of 300 kld per day. the entire plant will be constructed in msep / jink aluminium febricated. the stp shall be designed as per raw water, with necessary chemical dosing as required by the manufacturer's design. all the equipment, piping, pumps, air blowers and electrical panel etc. (defect liability period will be 05 years, all parts and machinery maintenance, replacement included in 05 year dlp) domestic sewage from domestic ward and hospital toilets, kitchens etc. from the commercial complex and shall be discharged into the stp. design to take consideration of same. daily average flow : 300 m3/day ph : 6.5 - 8.5 bod5 |
| Published Date | |
|---|---|
| Due Date | 05 Mar 2026 00:00:00 |
| Estimated Value | 2.45 Crore |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |