Details: (r-7/2.4.10.2.1) dismantling of flexible pavements and disposal of dismantled materials upto a lead of 1000m,stacking serviceable and unserviceable materials seperately as per morth specification clause 202 by mechanical means:bituminous courses (r-19/5.3) providing, laying, spreading and compacting stone aggregate of as per table 400-10 and 400-11 wet mix macadam specification including premixing the material with water to omc inwet mix plant as per approved design mix, carriage of mixed material by tipper to site laying in uniform layers with motor grader/ f.e. loader/ paver finisher in sub base/ base course on a well prepared under base and compacting with vibratory roller to achieve the desired density including lighting, guarding, barricading and maintance of diversion etc. (morth specification : clause 406) by mechanical means with all lead (r-20/6.1.1) prividing and applying primer coat on the prepared surface or granular base with bitumen emulsion (ss-1) as per is:8887 & manufa
Sector: Power Sector