Details: part a: civil works earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. the item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) depth of excavation not exceeding 1,500 mm. earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (payment to be made on the basis of measurement of finished quantity of work) supplying and laying polythene sheet (150 gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. cement concrete with grad
Sector: Export promotion