Details: :post-harvest operation and cold chain at nalban fisheries project. surface dressing of the ground in any kind of soil includingremoving vegetation inequalities not exceeding 15 cmdepth and disposal of the within a lead upto 75 mas directed. sq.m 187.00 11.31 2114.972 earth work in excavation of foundation trenches or drains,in all sorts of soil (including mixed soil but excluding lateriteor sandstone) including removing, spreading or stacking thespoils within a lead of 75 m. as directed. the item includesnecessary trimming the sides of trenches, levelling, dressingand ramming the bottom, bailing out water as requiredcomplete.(a) depth of excavation not exceeding 1,500 mm cu.m 200.00 134.92 26984.003 earth work in filling in foundation trenches or plinth withgood earth, in layers not exceeding 150 mm. includingwatering and ramming etc. layer by layer complete.(payment to be made on the basis of measurement offinished quantity of work)(a) with earth obtained from excavation of foundat
Sector: Fisheries