The WBSMB has published a tender for "NZRMC/eT/SECY/18(2nd call)13/2025-26" on the 25 Nov 2025. This tender belongs to Drain Construction category. This tender is published in Nadia, West Bengal location. The vendors interested in this tender and related Drain Construction tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: road and drain Tenders | drainage Tenders | drain Tenders
Related categories: Canal construction service Tenders | Main Canal Construction Tenders | Distributary Canal Construction Tenders |
Around 52926 tenders were floated in West Bengal in the past month with major spending on cc road Tenders, drain construction Tenders, tube well Tenders
| Tender Title | NZRMC/eT/SECY/18(2nd call)13/2025-26 |
|---|---|
| Tender Description | removal of ,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the municipal / corporation rules for such disposal, loading into truck and cleaning the site in all respect as per direction of engineer in charge dismantling r.c. floor, roof, beams etc. including cutting rods and removing as directed within a lead of 75 m. including stacking of steel bars.in ground floor including roof. dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing as directed within a lead of 75 m.in ground floor including roof. upto 150 mm. thick earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. the item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complet |
| Comments | removal of ,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the municipal / corporation rules for such disposal, loading into truck and cleaning the site in all respect as per direction of engineer in charge dismantling r.c. floor, roof, beams etc. including cutting rods and removing as directed within a lead of 75 m. including stacking of steel bars.in ground floor including roof. dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing as directed within a lead of 75 m.in ground floor including roof. upto 150 mm. thick earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. the item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complet |
| Published Date | |
|---|---|
| Due Date | 04 Dec 2025 00:00:00 |
| Estimated Value | 4.04 Lakh |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |