Details: dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing as directed within a lead of 75m.a) in ground floor including roof. earth work in excavation of foundation trenches or drains in all sorts of soil ( including mixed soil but excluding laterite or sand stone ), including removing, spreading or stacking the spoils with in a lead of 75 m. as directed and including trimming the side of trenches, leveling, dressing the bottom, bailing out water etc. as required complete.(a) depth of excavation not exceeding 1500 mm earthwork in filling in foundation trenches or plinth with good earth in layers not exceeding 150mm including watering and ramming etc. layer by layer complete. (with earth obtained from excavation of foundation. ) filling in foundation or plinth by fine sand in layers not exceeding 150mm as directed and consolidating by through saturation with water ramming complete including the cost of supply of sand(payment to be ma
Sector: Agri Marketing