Details: earthwork inexcavationof foundation trenches or drains, inall sorts of soil (includingmixed soil but excluding lateriteor sandstone) including removing, spreadingorstackingthespoilswithinaleadof75m. asdirected.theitemincludesnecessarytrimmingthe sidesof trenches, levelling,dressingandrammingthe bottom, bailing out water as required complete. (a) depth of excavation not exceeding 1,500 mm. earthwork infillinginfoundationtrenchesorplinth with good earth, in layers not exceeding 150mm. includingwateringand rammingetc. layer by layer complete. (payment to be made on the basis of measurement of finished quantity of work)(a) with earth obtained from excavation of foundation ordinarycement concrete (mix1:1.5:3) withgraded stonechips (20mm nominal size)excluding shutteringandreinforcement ifany, ingroundfloor as per relevant is codes. reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of
Sector: Agri Marketing