Details: earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilizing the remaining earth locally for road work (reference to mort&h's specification clause 304).ordinary soil, manual means (depth upto 3 m) back filling behind abutment, wing wall and return wall complete including sprinkling water and thoroughly compacted with plate compactor/power rammer in layers not exceeding 150mm compacted thickness as per drawing and technical specification (710.1.4 of irc:78 & morth's specification 2200).granular material, using rbm. boulder apron laid in wire cratesproviding and laying of boulder apron laid in wire crates made with 4mm dia wire dia not less than 4mm gi wire conforming to is: 280 & is:4826 in 100mm x 100mm mesh mesh size not more than 150mm (weaved
Sector: Road development