Details: demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of engineer - in - charge. nominal concrete 1:4:8 or leaner mix (i/c equivalent design mix) taking out existing cc interlocking paver blocks/metro tiles from footpath/ central verge, including removal of etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of engineer-in-charge. taking out existing precast rcc/cc/ red sand stone footpath slab/boundary wall of park laid in cement mortar including stacking or serviceable material and disposal of unserviceable material within 50 metre lead as per direction and entire satisfaction of engineer - in - charge. providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level : 1:2:4 (1 cement : 2 coarse sand
Sector: Municipality