Details: dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately etc. complete. removing rich mix cement concrete including stacking the spoils as directed with all leads, lifts etc, complete. construction of dry lean cement concrete sub- base over a prepared sub-grade with coarse and fine aggregate ( vsi grade finely washed crushed sand) conforming to is: 383, the size of coarse aggregate not exceeding 25 mm, , cement content not to be less than 150 kilogram/ , optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 mpa at 7 days, mixed in a batching plant/ weigh batch mixer, transported to site with all leads and lifts, laid with a paver with electronic sensor /by suitable means as approved by engineer-in-charge , compacting with vibratory roller, finishing, curing and including preparation of sub-grade sur
Sector: Municipality