Details: excavation for foundation/ pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. excavation for foundation / pipe trenches in hard murum including removing the excavated materia upto a distace of50 m and lifts as below, stacking anc spreading as directed by engineer-in- charge, normal dewatering, preparing thebed for foundation anc excluding backfilling, etc. complete. (bd-a2/259)lift 0 to 1 .5 m excavation for foundation in hard rock by chiselling, wedging, line drilling, etc. including trimming and levelling the bed, removing the excavated material upto a distance of 50 metres beyond the building area stacking as directed, dewatering and back filling with available earth/ murum watering, ramming etc. complete. (lift upto 1.5 m). providing and supp
Sector: Municipality