Details: excavation for foundation / pipe trenches in hard murum and boulders, w.b.m. road including removing the excavated material upto a distance of 50 m beyond the area and lifts as below, stacking and spreading as directed by engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc.complete. (bd-a-3/259) excavation for foundation / pipe trenches in soft rock and old cement and lime masonry foundation asphalt road including removing the excavated material upto a distance of 50 m beyond the area and lifts as below, stacking as directed by engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (bd-a-4/259) dewatering the excavated trenches and pools of water in the building trenches/pipe line trenches, well works by using pumps and other devices including disposing off water to safe distance as directed by engineer-in-charge (includi
Sector: Municipality