The Karnataka Directorate of Municipal Administration has published a tender for "Electrification and supplying and fixing of electrical components for the efficient functioning of the Baridevarakoppa wettwell" on the 05 Mar 2026. This tender belongs to Power System Construction category. This tender is published in Dharwad, Karnataka location. The vendors interested in this tender and related Power System Construction tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: electric power system Tenders | electric power lines Tenders | electrical system services Tenders
Related categories: Lighting installation services Tenders | High Mast Light Tenders | Street Light Installation Tenders |
Around 17811 tenders were floated in Karnataka in the past month with major spending on pipe laying Tenders, road relaying Tenders, afforestation services Tenders
| Tender Title | Electrification and supplying and fixing of electrical components for the efficient functioning of the Baridevarakoppa wettwell |
|---|---|
| Tender Description | pre - stressed tubular spun pole 11 mtr long - 500 kg wl 1.07;single pole transformer structure kit with three h frames without tranformer seating and seating angle support cross arm for 63/100/250/500 kva(ug cable) ms;11 kv, 5kn composite/polymeric pin insulator(24mm dia fp rod);alkathene tube 19 mm dia and in coils of 30 mtr- by agency;gos 11 kv, 200 amps single break gos (dwg no. bescom/gm/qs&s/23 dtd 24.11.2018) escoms sr 2023-24 page no 347 [i.no:24.01;fixing gos fixing of gos including wiring (11 kv single break 200 amps escoms sr 2023-24 [pg.no:384 i.no:13.02];errection of pre - stressed tubular spun pole 11 mtr long - 500 kg wl;errection of single pole transformer structure kit with three h frames without tranformer seating and seating angle support cross arm for 63/100/250/500 kva (ug cable) ms;base concreting 1:4:8, 1000x1000x150 mm;pole concreting 1:2:4, 1000x1000x2500 mm;coping 1:2:4 (as per actuals);dismantling rcc pole - 9 mtr long, 145 kg wl;granular aggregates granular |
| Comments | pre - stressed tubular spun pole 11 mtr long - 500 kg wl 1.07;single pole transformer structure kit with three h frames without tranformer seating and seating angle support cross arm for 63/100/250/500 kva(ug cable) ms;11 kv, 5kn composite/polymeric pin insulator(24mm dia fp rod);alkathene tube 19 mm dia and in coils of 30 mtr- by agency;gos 11 kv, 200 amps single break gos (dwg no. bescom/gm/qs&s/23 dtd 24.11.2018) escoms sr 2023-24 page no 347 [i.no:24.01;fixing gos fixing of gos including wiring (11 kv single break 200 amps escoms sr 2023-24 [pg.no:384 i.no:13.02];errection of pre - stressed tubular spun pole 11 mtr long - 500 kg wl;errection of single pole transformer structure kit with three h frames without tranformer seating and seating angle support cross arm for 63/100/250/500 kva (ug cable) ms;base concreting 1:4:8, 1000x1000x150 mm;pole concreting 1:2:4, 1000x1000x2500 mm;coping 1:2:4 (as per actuals);dismantling rcc pole - 9 mtr long, 145 kg wl;granular aggregates granular |
| Published Date | |
|---|---|
| Due Date | 17 Mar 2026 00:00:00 |
| Estimated Value | 18.59 Lakh |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |